App Icon
Plant & Equipment Désormais disponible sur l'App Store
Télécharger
Le message est transmis au conseiller qui prendra bientôt contact avec vous pour fixer un rendez-vous.
Votre demande d'expédition a été transmise, un conseiller vous contactera prochainement.
Votre demande d'inspection a été envoyée avec succès. Vous serez contacté prochainement.

2020 NODIGMARKET24 NDM-20

Survivre

Prix
AED 102,870 $ 28,030 € 23,969 £ 21,770 رس 105,953


Fabricant

Modèle

Année
2020

Condition


SKU
156939

La Description
Engine

Brand: Honda GX 390

Fuel: petrol


Condition: used

I offer jacking machines controlled NODIGMARKET24, Model: NDM-20 (200kN) for passing under roads, rivers and tracks.


The machines are produced with various hydraulic parameters. The example machine in the pictures has a tensile force of 200kN (20t) and allows pulling PE pipes up to 200mm.


The maximum length of the jacking is 60m. It also enables cracking on small asbestos, cast iron and stoneware pipes.


Execution of the controlled squeeze takes place at the execution of a small excavation, rough setting of the machine, arming the warhead with a radio probe and pilot drilling. Then, mount the expanding head depending on the diameter of the installed pipe and pull it into the ground. The whole process is done dry. Drilling polymers are used to retract the pipe over a longer distance. giving a significant slip and reducing friction when pulling.


If you have questions or interest, please contact us via the form or by phone.


Eng. Damian Sobczak

Specialist in the construction of culverts and mechatronics
Engine

Brand: Honda GX 390

Fuel: petrol


Condition: used

I offer jacking machines controlled NODIGMARKET24, Model: NDM-20 (200kN) for passing under roads, rivers and tracks.


The machines are produced with various hydraulic parameters. The example machine in the pictures has a tensile force of 200kN (20t) and allows pulling PE pipes up to 200mm.


The maximum length of the jacking is 60m. It also enables cracking on small asbestos, cast iron and stoneware pipes.


Execution of the controlled squeeze takes place at the execution of a small excavation, rough setting of the machine, arming the warhead with a radio probe and pilot drilling. Then, mount the expanding head depending on the diameter of the installed pipe and pull it into the ground. The whole process is done dry. Drilling polymers are used to retract the pipe over a longer distance. giving a significant slip and reducing friction when pulling.


If you have questions or interest, please contact us via the form or by phone.


Eng. Damian Sobczak

Specialist in the construction of culverts and mechatronics

Montre plus Montrer moins
Contact
Pologne
Membre depuis Jun. 2020
Back
img